Before starting a project what should be done to ensure best results?

Calculate the square footage of the project area to determine the required amount of G3 – Pathway Stabilizer and other material quantities needed.

Consider methods for excavation and removal of native soil or existing structures, as well as transportation, delivery, and installation of new materials.

Select and test a suitable decomposed granite (DG) or crushed stone material.
Consider proper slope and finished grade of a G3-PS project to allow for drainage and runoff, as well as ease of use with adjacent structures or landscaping.>

Pause irrigation sprinklers and check weather forecast for temperature ranges to ensure there will be not be any precipitation within 72 hours of installing G3 – Pathway Stabilizer.